The mining and stripping project has a maintenance plant covering an area of 50000 square meters, a spare parts warehouse of over 1000 square meters, and 20 multifunctional workshops; Mechanical engineers, electrical engineers, welding engineers, etc., with various vehicle and engineering machinery equipment maintenance conditions.
Having over 350 units of various equipment, including mining machinery vehicles such as mining trucks, excavators, bulldozers, drilling rigs, loaders, as well as engineering auxiliary equipment such as rollers, sprinklers, oil tankers, cranes, trailers, maintenance vehicles, cars, buses, etc.
8 oil tanks, storing 400000 liters of oil.